
What does a kitchen remodel cost in the West Valley?
Real ranges from Botello Builders projects in Buckeye, Goodyear, Surprise and nearby. 6–8 weeks on site. Fixed price before work starts.
Three levels, three ranges
Pick the one closest to your project. The estimator below narrows it down.

Same layout, new cabinets and counters.
- New cabinets
- Quartz countertops
- Backsplash tile
- Sink and faucet

Better materials and a working island.
- Semi-custom cabinets
- Island
- New lighting plan
- Backsplash and flooring

Walls opened, fully custom kitchen.
- Wall removal with engineering
- Custom cabinetry
- Natural stone
- Panel-ready appliances, 3D design
What moves the price up
- Moving the sink, range or gas line
- Removing a wall (beam, engineering, permits)
- Custom versus semi-custom cabinetry
- Natural stone and waterfall edges
- Kitchen size and cabinet count
What brings it down
- Keep the sink and range where they are
- Reuse your appliances
- Quartz instead of natural stone
- Semi-custom cabinets with upgraded hardware
Where the money goes
Cabinetry is usually the biggest line in a kitchen, followed by countertops, then labor for installation, plumbing and electrical, then lighting, backsplash and flooring. Appliances are separate unless you want us to source them.
How your price gets locked
After a free 15-minute call and a site visit, a paid design phase produces drawings, 3D renders and every selection — tile, cabinets, fixtures, finishes. From that we write a fixed-price contract with every line item and a milestone payment schedule. The price you sign is the price you pay. If something changes, it’s written up and priced before any work happens.
What it costs per day
An Upgrade-level kitchen remodel averages roughly $2,200–2,900 per working day over 6–8 weeks on site. It’s a useful way to see why careful scheduling and sequencing matter: every day saved is real money.
Not ready for a full remodel?
New countertops and backsplash, or refacing cabinets in the same layout, refresh a kitchen at a lower cost.
Get your planning range
Four questions, under a minute.
Pricing questions
Are appliances included?
No. You can keep your current appliances or buy new ones; we plan the cabinets around them.
Do prices include design?
The design phase is separate: about $2,500–5,000 for a kitchen, including 3D renders and every selection.
Can we use the kitchen during the remodel?
Not during construction. We help you plan a temporary kitchen setup for the 6–8 weeks.
Is this a quote?
No. These are planning ranges from our own projects. Your fixed price is set in the contract after design and selections are complete.
5.0 stars from 110 West Valley homeowners
Read all reviews on Google“Botello is hands down one of the best contractors I’ve ever worked with. Great company and will continue to do business with them!”
“This is an amazing team! Everything from design to demo, framing and paint, they are friendly with solid skills. I have many more future projects for this group!”
“Steve and the Botello Builders team were fantastic! Very professional, accommodating, and executed the install of our recent flooring project flawlessly! Highly recommend and would refer to close friends and family for home contracting and improvement project needs.”